How leading mining company IGO extracted value and reduced risk

Learn how IGO automated financial reporting and life-of-mine budgeting with QMetrix to eliminate spreadsheet risk.

Independence Group NL (ASX: IGO) is a leading ASX-listed exploration and mining company headquartered in Perth, Western Australia. With a strategic focus on high-quality assets of scale and longevity, IGO aligns its business with the global structural shift towards energy storage through nickel, copper, cobalt, and gold mining operations.

Mining site with mining vehicles

As IGO grew, its financial reporting and budgeting processes became heavily dependent on complex, layered Excel spreadsheets. While functional, this spreadsheet-based setup was increasingly difficult to maintain and posed operational challenges:

  • Lack of integration and version control: Manual linking between multiple spreadsheets opened up risks of broken formulas, data inconsistencies, and version conflicts across entity reports.
  • Time-consuming consolidation: Preparing financial and budgeting data required labour-intensive manual work, taking days out of every reporting cycle.
  • Complex long-term planning needs: As a mining organisation, IGO required a system capable of handling granular physical and operational metrics alongside 20- to 30-year “life of mine” budgets.

IGO needed a robust, single source of truth to streamline entity consolidation, improve collaboration between corporate headquarters and mine sites, and de-risk their financial reporting.

IGO engaged QMetrix to design and deploy a phased Financial Planning and Analysis (FP&A) framework tailored to their specific operational needs.

Phase 1: Automated financial reporting and ERP integration

QMetrix established core reporting structures – including general ledger and multi-entity models – directly integrated with IGO’s Pronto ERP.

By replacing manual data extraction with an automated link, entity consolidation went from a multi-day spreadsheet exercise to an automated, single-click process.

Comprehensive training was delivered across corporate and mine site teams to build alignment and confidence.

Phase 2: Driver-based budgeting and physicals tracking

Building on the foundation phase, QMetrix implemented a tailored budgeting and planning model.

This solution captures granular physical metrics (such as tonnage and extraction rates) alongside financial numbers.

These physical drivers directly inform financial calculations across multi-decade “life of mine” plans, ensuring operational assumptions translate accurately into financial projections.

Partnering with QMetrix transformed IGO’s reporting and planning capabilities into an agile, trustworthy operation:

  • Automated month-end consolidation: Reduced multi-entity reporting timelines from days to the click of a button.
  • Single source of truth: Established unified, reliable reporting across financial actuals, budgets, and physical mining metrics.
  • Streamlined ASX compliance: Significantly reduced the time and manual effort required for statutory and regulatory reporting.
  • Enhanced strategic value: The finance team shifted away from manual data assembly, enabling them to partner closely with site managers to conduct deeper financial analysis.
Faith Luo

Faith Luo

B.A (Comm & Soc), Dip.Vis.Comm

CONNECT